The Importance Of The Detroit Windsor Jobs Tunnel

By region, Canadians do the most business within thehigh-capacity rail cars and double-stacked seatainers
Great Lakes region by nearly four times over thewill not fit through the existing tunnel. A new, larger
Midwest region.tunnel must be built. The new, larger tunnel will be built
The Automotive Industry in Canadanext to the existing tunnels.
With the signing of the North American Free TradeHow the New DRTP Rail Tunnel Will Be Built
Agreement (NAFTA), the automotive industry foundThe new DRTP rail tunnel will have an inside diameter
Canada and Ontario in particular a welcome place toof nearly 27 feet to accommodate the
do business. Recently, automotive jobs in Ontario arenext-generation rail cars and double-stacked
on the increase while in Michigan they are on theseatainers. The tunnelling will be through the soft clay
decline. Last year, Ontario built more cars and truckslayer, using a pressure-balanced, tunnel boring machine
than any other location in North America.(TBM) shown in the middle left.
Detroit/Windsor Rail Corridor Is Vital to the NationalThis unique machine is huge and is used to bore
Transportation Networkthrough the clay layer while building the tunnel behind it.
The Detroit River Tunnel Partnership (DRTP) ownsEqualized pressure is maintained at the cutting head to
and operates the 100-year-old rail corridor that runsprevent problems with the clay layers above the
from Highway 401 in Canada to I-75 in Detroit. All themachine. Once the pre-cast, concrete tunnel segments
land within the corridor is owned by the DRTP. Theare laid in place by the machine, the entire geological
tunnel serves CPR and any other railroad operatorsstructure is stabilized. The tunnel is completed when
that wish to use the tracks, making this a "neutralthe TBM breaks through on the opposite side from
tunnel." The Detroit rail crossing run by the DRTP is anwhere it started tunnelling.
ongoing business and carries over 450,000 rail cars aThe DRTP Jobs Tunnel will be 1.6 miles long and can
year. This is equivalent to over 1,000,000 truckloads.be completed in less than four years after the
The DRTP/CPR corridor is an existing, 100-year-oldenvironmental assessment (EA) is completed and
transportation corridor through Windsor and Detroit.government permits are granted.
Much of this corridor is surrounded by vacant orThe new rail tunnel will be completed in five phases:
industrial land.1. Environmental Assessment Phase
Keeping Viable Rail Service in Detroit2. Engineering Design Phase
This tunnel is challenged by its age. Next-generation rail3. Funding Commitment Phase
cars are being put into service by the railroad industry4. Tunnel Construction Phasei. Tunnel Boring Machine
now and will continue over the next several years.Commitmentii. Tunnel Liner Commitment
These taller rail cars are bigger than the inside5. Commissioning Phase
diameter of the existing tunnel. In 1906 when this tunnelThe New Detroit Windsor Jobs Tunnel Security
was built, no one could have imagined a rail car 21 feet,Security is an important part of CPR's daily business.
10 inches tall!This is especially true in the Detroit/Windsor corridor.
Below is a recent article regarding American HondaCPR operates its own police force on both sides of
Motor Company's purchase of $100 million worth ofthe border to ensure security.
the new, taller rail cars. These new cars will not fitAlso, all rail cars are run past a VACIS (Vehicle and
through the existing Detroit/Windsor rail tunnel.Cargo Inspection System) device to Gama-Ray all rail
Honda is shipping cars by new Auto-Max railcarscars before entering the United States. The
The Greenbrier Companies announced today itgovernment-monitored system, using trackside towers
hasreceived the largest order ever for its Auto-Max(such as the one shown at right) can detect
railcarused for transporting new automotive vehicles.stowaways, contraband, and explosive devices by
The $100million order is from American Honda Motorgenerating an interior image of each railcar and its
Co., Inc.contents whether they be tank car, hopper car,
The extra-wide decks in Auto-Max railcars can becontainer or boxcar, as it rolls by at 5-7 miles per hour.
adjusted to adapt to changing consumer patterns. InMoreover, the new rail tunnel will have the most
addition to carrying passenger vehicles three high,sophisticated sensor array of any tunnel on the North
Auto-Max is the only railcar that carries most sportAmerican border.
utilities, cross-over vehicles, compact pickups, andWith all these security measures, this border crossing
minivans in a tri-level (three-high) configuration. Theis safe.
decks are also readily convertible to carry large SUVsIt is clear that the CPR track system is a key element
and large pickup trucks in a two-high configuration duein delivering the products needed to keep millions of
to Auto-Max's patented features.Americans working in the Midwest. And, it is also clear
[Posted Feb 14, 2006 at Inside Line, an Edmunds.com,that this system is jeopardized by the restrictions of a
Inc. blog]100-year-old tunnel in Detroit that is not adequate for
The Solutionthe next-generation rail cars coming on line.
As discussed previously, the next-generation,