Developments Adjacent to Existing MRT Structures

1. Introductionfound to be in order;b) Qualified persons has fully
Given the wide network of the MRT system indemonstrated and confirmed that it is feasible for the
Singapore and rate of building development, thedevelopment works to fully meet the technical
potential of land development along MRT lines is veryrequirements of Section 10 to 12 of the "Code of
high. In order to carry out such development, it is veryPractice for Railway Protection".
common to see building structures and basement*Application for such exemption can be made using
structures adjoining to or directly above the existingFORM LTA DBC RAIL EXEMPT which is available in
MRT lines.the "Guide To Carrying Restricted Activities within
Such construction must be carried out in a mannerRailway Protection and Safety Zones".
according to the Code of Practice to avoid detrimental3. Protective Measures
effects on the sensitive MRT structures. It is importantProtective measures are essential when carrying out
to have proper and adequate precaution/ protectionconstruction work in close proximity to the MRT
measures incorporated in the design and constructionstructures. The protective measures can include the
works to avoid such effects.following:a) Rigid retaining structures (e.g. diaphragm
2. Safety and Protectionwalls);b) Proper construction methods (e.g. top down
2.1 Code of Practice for Railway Protectionconstruction methods);c) Good water tight retaining
New developments that are taking place in closestructures;d) Water recharging wells;e) Soil
proximity to existing MRT lines are subjected to theimprovement techniques (e.g. jet grout);f) Debonding of
approval of Land Transport Authority (LTA). Fullpiles and diaphragm walls in the 1st and 2nd
compliance of the technical requirements must beReserves;g) Silent Piler.
achieved as specified in the Code of Practice forInstrumentation are also necessary to monitor the
Railway Protection. The Code requires the developerschanges that might affect the tunnels during the
to ensure that the movement of the MRT structures isconstruction works.
limited to the following requirements:a) Movement in3. Conclusions
any direction limited to 15mm;b) Rotation of the tracks1) Good planning and control system consisting of
limited to 1:1666 in any plane.Codes, Guidelines and proper procedures are essential
However, there are cases where the allowable limitsin ensuring the successful execution of new
may be adjusted according to the site conditionsdevelopments near existing MRT structures and
(Doran, et al, 2000). Special care has to be taken whenmaintaining public safety. The establishment of the
undertaking installation of piles and diaphragm wallsallowable limits by local authorities based on design
with the 1st and 2nd Reserve Lines.conditions and field performance provide a useful guide
Safety measures must be adequately in placeto the engineers/contractors of these critical projects.
especially during the installation of piles and diaphragm2) Construction activities within the Railway Protection
walls within the 1st and 2nd Reserve Line of the MRTZone shall be regularized and controlled by the Code
structure. Usage of permanent casings can minimizeof Practice for and executed under the supervision of
the potential for any imposed stress on the MRTcompetent engineers for minimizing detrimental effects
structure for installation of piles and diaphragm walls.on the existing MRT structures.
2.2 Planning/ Design Consideration3) The effects of construction on the existing MRT
Necessary permits from LTA must be approvedstructures hall be properly evaluated by necessary
before any new development in close proximity toanalyses in the design and verified by suitable
existing MRT structures can take place. The variousinstrumentation system during construction.
documents to be submitted to LTA for approval4) The application of suitable protective measures, e.g.
includes the following:a) Method Statement of Work;b)rigid retaining system, soil improvement techniques,
Instrumentation Proposal;c) Review Levels for variousspecial equipment and advanced automatic monitoring
instruments.systems are fond with significant contribution to the
All documents are to be submitted by the Qualifiedsafety control of underground MRT structures in close
Person (QP) to LTA before the undertaking of anyproximity to construction sites in view of its sensitivity
construction of such nature. Site activities are strictlyand restricted accessibility. However, proper
allowed to proceed after approval by LTA. Forinterpretation of the instrument readings, application of
construction of underground tunnels, exploration,good engineering judgment and supervision by
foundation works and development work which wouldcompetent geotechnical engineers are needed.
involve the use of a crane, an application for theReferences
exemption of the provisions under the Rapid Transit1) Land Transport Authority 2000, Code of Practice for
Systems (Railway Protection, Restricted Activities)Railway Protection, Singapore
Regulations* shall be made by the qualified person in2) S.K.Kong, Moh and Associate Pte Ltd, Safety
writing.Control for Development Adjacent to Existing MRT
LTA will approve the developmental proposal in writingStructures , Singapore
if the following requirements are compiled with:a)3) Doran S.R., Wood T, Tham S.K., Copsey J.P. Shirlaw
Qualified person has complied with the requirements ofJ.N. & Wen D. 2000, The Assessment of Limits
Clauses 4.2 to 4.5 of the "Code of Practice forfor The Movment of Subway Tunnels and
Railway Protection" and that all items submitted areTrackworks Due to Adjacent Construction.